Line check of HIPOT equipment and required specific PPE at S03.
Line check confirms that LOTO implementation is compliant with safety procedures.
Line check activities at S02 are carried out with the Lock Out Tag Out (LOTO) system installed and implemented in accordance with safety procedures.
– Insulated gloves
– Safety glasses
– Barricades, Signage
GMAe’s ongoing testing activities are carried out to ensure that the control and protection systems function optimally, are stable, and comply with operational standards before
Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning
Lightening protection for 100 houses, IP phone, Internet and Camera system.