Line check of HIPOT equipment and required specific PPE at S03.
Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning
Repair done on the vessel, Main panel , as well as the steering system
Plem and buoy Electrical and control system installation, Test and commissioning on site.