Category - Uncategorized

Safety Equipment & PPE Required

– Insulated gloves
– Safety glasses
– Barricades, Signage

Full Project »
Kaombo FPSO MOdule South P17

Kaombo Process Module FPSO, under Total, Saipem and Siemens. Complete E&I fabrication and installation.

Full Project »
Aventure SuperYatch systems repair

SuperYatch maintenance and panel calibrations

Full Project »
Jangkrik Process Barge

Jangkrik Load test and MV Power commissioning

Full Project »
Chevron Pipe rack installations

We have done many pipe racks modules, installation. Project JN1154.

Full Project »
Pertamina Drilling Rig Protection system update

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Project »
MV Vigourous MSB Calibration & TEst

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Project »
Mutiara Jawa 1, coal transhipper measuring system

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Project »
ODS Oil metering skid

E&I installation of metering skid for Oil, including Heat Tracing installation and sampling system.

Full Project »