Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb
Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..
6 ACB to clean and verify before its future voyage. We completed our work in record time.
Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.
3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs
E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA
Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well
Conversion from DC motors, Ward Leonard system to AC drives, for Hoist & Boom.