Line check of HIPOT equipment and required specific PPE at S03.
GMAe’s ongoing testing activities are carried out to ensure that the control and protection systems function optimally, are stable, and comply with operational standards before
Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning
Plem and buoy Electrical and control system installation, Test and commissioning on site.
Fabrication and installation of the metering skid. Flow meters control