Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.
E&I installation of metering skid for Oil, including Heat Tracing installation and sampling system.
Loading vessel which brings 5 modules to Russia, need external container with Transformers and power supplies , step Down.
We have done the design, calculations,
Load TEst 6Mva @690V on this vessel , electrical propulsion
Cleaning and testing of all vaccum breakers , bus bar, and protections test for the MV and LV , MSB and ESB Panels. Hynday and
Load Test done on Two Ulstein Design Reverse Bow PSV, High tech vessels. Power plant 10 Mw.
INstallation of several system on the SRU unit for CIDADE DE CARAGUATATUBA, PetroBrass & Modec standards
Power system test and commissioning for this Russian Trawler / Freezing factory
FEderal II General alarm system major upgrade, including new HMI, remote displays, 445 Analog inputs and 540 Digital inputs. Installation of new alarm columns.