Category - E&I

Line Check The HIPOT Equipment And Specific PPE At S03

Line check of HIPOT equipment and required specific PPE at S03.

Full Project »
Commence Loading B37-M01 Onto Barge

Loading of B37-M01 units onto a barge as part of the logistics and preparation stages for delivery to the project site.

Full Project »
Continue testing GMAe

GMAe’s ongoing testing activities are carried out to ensure that the control and protection systems function optimally, are stable, and comply with operational standards before

Full Project »
Well Head Control Platform 6 Wells

Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning

Full Project »
Soft Soft Starter panels

Big capacity Auto transfo, and tuning

Full Project »
Metering Skid P306

Fabrication and Installation on Metering skid, complete

Full Project »
SPM “Single Point Mooring Buoy”

Plem and buoy Electrical and control system installation, Test and commissioning on site.

Full Project »
P301 Metering Skid

P301 Module for metering skid, for China.

Full Project »
Bratasena Metering Skid

Fabrication and installation of the metering skid. Flow meters control

Full Project »