Kaombo Process Module FPSO, under Total, Saipem and Siemens. Complete E&I fabrication and installation.
We have done many pipe racks modules, installation. Project JN1154.
We have done one specific module for Chevron , Jurong , PAU 57. E&I installation and test, pre-commissioning. This is On Shore for chemical processing,
Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..
Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.
3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs
E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA
Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.