Load TEst for Power system , EHouse for Land Rig Ds10. 690V, 5Mva
Complete Turn Key , from Design & calculations, Documentation, Class Approval, Panel Production, installation and test, Accomodation and offshore crane barge 300T, ABS class MOPU.
Complete Electrical system for Bulk Carrier Pusri Indonesia I, 17500 Dwt, 120m long. From Load calculation to panel design, manufacture, test & commissioning. All systems
DP1 system from Kongsberg, Thurster control, DC motor 150KW. Test and pre-commissioning,
Complete system , MSB, panels, generators controls, alarms, and crane controls. Turn key. Launched June 11 2013.
High speed Communication Network, for DP system, Thurster system, Cranes and IT for offices.. We have installed and tested the network, DNV class.
New control system for grab for this enormous coal loader, VSd and cabin control.
Cesano is an olf jack up from Transocean, and Gryphone is working on upgrades and contract, conversion to MOPU. As such, we worked on the
Accommodation Barge Sea Heaven 7, we have provide complete PMS, Msb, as well as PAga, Fire alarm, Phone system, Gas Alarm, Ch4 alarms, and crane