Cleaning and testing of all vaccum breakers , bus bar, and protections test for the MV and LV , MSB and ESB Panels. Hynday and
Load Test done on Two Ulstein Design Reverse Bow PSV, High tech vessels. Power plant 10 Mw.
Power system test and commissioning for this Russian Trawler / Freezing factory
FEderal II General alarm system major upgrade, including new HMI, remote displays, 445 Analog inputs and 540 Digital inputs. Installation of new alarm columns.
Repairs on the SYnchronization system as well as Main engines alarm system.Caterpillars (overspeed, Low pressure, High temperature, Exhaust temp)
Dredging crane retrofit for DC generator, 900kw drive, and repair of control logic.
Retrofit AC/DC to replace an obsolete Ward Leonard system for Hoist and Grab. Two DC motors 250kw, 600Vdc. Repairs on old control system.
Calibration of Drilling floor equipments, including Hook load, Mud pumps pressure, Counters, Annulus pressures. Teco system, now NOV.
Repairs & Calibration of the Cement / Bentonite System on Valliant Drilling rig, Former ENSCO rig.