Dredging Crane 1967 Retrofit DC system

Retrofit AC/DC to replace an obsolete Ward Leonard system for Hoist and Grab. Two DC motors 250kw, 600Vdc. Repairs on old control system.

Full Project »
Drilling Rig Instrumentation Calibration

Calibration of Drilling floor equipments, including Hook load, Mud pumps pressure, Counters, Annulus pressures. Teco system, now NOV.

Full Project »
Drilling Rig Cement System

Repairs & Calibration of the Cement / Bentonite  System on Valliant Drilling rig, Former ENSCO rig.

Full Project »
Land Rig Power Module commissioning

Load TEst for Power system , EHouse for Land Rig Ds10. 690V, 5Mva

Full Project »
Offshore 300T Accomodation & Crane Barge

Complete Turn Key , from Design & calculations, Documentation, Class Approval, Panel Production, installation and test, Accomodation and offshore crane barge 300T, ABS class MOPU.

Full Project »
Pusri Indonesia I, Phosphate Bulk Carrier 120m long

Complete Electrical system for Bulk Carrier Pusri Indonesia I, 17500 Dwt, 120m long. From Load calculation to panel design, manufacture, test & commissioning. All systems

Full Project »
Lady Norma DP1 and Thruster DC variator

DP1 system from Kongsberg, Thurster control, DC motor 150KW.  Test and pre-commissioning,

Full Project »
Iron Ore transfer barge

Complete system , MSB, panels, generators controls, alarms, and crane controls. Turn key. Launched June 11 2013.

Full Project »
Communication Network on SemiSub Derwent

High speed Communication Network, for DP system, Thurster system, Cranes and IT for offices.. We have installed and tested the network, DNV class.

Full Project »