Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.
3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs
E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA
Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well
Conversion from DC motors, Ward Leonard system to AC drives, for Hoist & Boom.
Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.
E&I installation of metering skid for Oil, including Heat Tracing installation and sampling system.
Loading vessel which brings 5 modules to Russia, need external container with Transformers and power supplies , step Down.
We have done the design, calculations,
Load TEst 6Mva @690V on this vessel , electrical propulsion