Oil & Gas pipe production line, total of 43 conveyors, for pipes up to 3 tons. We have done 5 main control panels, 27 control
New control system for grab for this enormous coal loader, VSd and cabin control.
Conveyor motors, soft starter, 5 *680KW Medium voltage motors. System upgrade and installation. Indominco Bontang, Kalimantan. 5Km long
Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system
Global Automation repaired and tuned the steering system controlling the Azimuth thrusters. Electrical and Hydraulic
Controls of washing tower for pipes. Complete system, including plc, touchscreen and panels,
Global Automation in-house Research and Development team have designed and fabricated a Robotic Device which will cut piping precisely with the correct bevel required prior
Global Automation in-house Research and Development team have designed and fabricated a Demag System for Pipe Laying barges, the system integrates a magnetic reader, and
The machine was imported to Batam from Korea, it is the largest flanging machine in SE Asia. Global Automation repaired the control system, installed. tested