Category - Industrial

Oli&Gas Pipe Production line

Oil & Gas pipe production line, total of 43 conveyors, for pipes up to 3 tons. We have done 5 main control panels, 27 control

Full Project »
Coal loader retrofit

New control system for grab for this enormous coal loader, VSd and cabin control.

Full Project »
3.3KV, 680KW conveyors soft starters

Conveyor motors, soft starter, 5 *680KW Medium voltage motors.  System upgrade and installation. Indominco Bontang, Kalimantan. 5Km long

Full Project »
Power Plant test Derwent 14MW

Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system

Full Project »
Tug Boat Steering system, Azimut thrusters

Global Automation repaired and tuned the steering system controlling the Azimuth thrusters. Electrical and Hydraulic

Full Project »
Washing tower for pipes

Controls of washing tower for pipes. Complete system, including plc, touchscreen and panels,

Full Project »
Oxycart Robot / Cutting pipes

Global Automation in-house Research and Development team have designed and fabricated a Robotic Device which will cut piping precisely with the correct bevel required prior

Full Project »
Demag System for Pipe Laying barges

Global Automation in-house Research and Development team have designed and fabricated a Demag System for Pipe Laying barges, the system integrates a magnetic reader, and

Full Project »
Dishing machine Faccin

The  machine was imported to Batam from Korea, it is the largest flanging machine in SE Asia. Global Automation repaired the control system, installed. tested

Full Project »