Category - E&I

Pertamina Drilling Rig Protection system update

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Project »
Orinite Plant for Chevron

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Project »
Mutiara Jawa 1, coal transhipper measuring system

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Project »
ESS800 & ESS001 YAnmal project, EHouses

E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA

Full Project »
NOV Weather Station Calibration

Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.

Full Project »
ODS Oil metering skid

E&I installation of metering skid for Oil, including Heat Tracing installation and sampling system.

Full Project »
Medium Voltage MSB & ESB Maintenance

Cleaning and testing of all vaccum breakers , bus bar, and protections test for the MV and LV , MSB and ESB Panels. Hynday and

Full Project »
MV27 Water Treatment Plant, SRU unit, Suez environement

INstallation of several system on the SRU unit for CIDADE DE CARAGUATATUBA, PetroBrass & Modec standards

 

Full Project »
FPSO FEDERAL II General Alarm System

FEderal II General alarm system major upgrade, including new HMI, remote displays,  445 Analog inputs and 540 Digital inputs.  Installation of new alarm columns.

Full Project »